Commissioning

Furnace Fabrica (I) Ltd. maintains a highly skilled and specialized team of commissioning engineers for the commissioning of plants constructed by us. The team members come from a wide range of engineering disciplines and have extensive experience of working in various process plant industries.

FFIL supports plant commissioning by deputing a dedicated commissioning team as per contractual obligation or as per clients requirements. The commissioning team is headed by a commissioning engineer, who is supported by process engineers, operators, experts of critical equipment and working crew. As needed, an expert from the process licensor also joins the team.

 

Pre-Commissioning Tests:

Pre-commissioning tests comes as the most critical stage before commissioning. Our engineers are trained to take utmost care by taking detailed notes on every feature of the plant during the pre-commissioning. To tackle critical machineries and equipments, FFIL takes extra precaution by deputing the manufacturers engineers to test the machineries before taking them online

Training:

Prior to startup, class room training is provided for better orientation of the client’s personnels. In addition, Haz-op review, trial of critical equipment and alterations in control system if required are completed. As the plant is taken on stream, the operators are provided hands-on training and the various aspects of the operations are also emphasised to them.

Documentation and Handover:

On successful commissioning, the final documentation is prepared and a comprehensive report on Commissioning, Process Data Verification, Plant Performance Evaluation and Guarantee Trial Run data & report is submitted during the plant take-over by the client. Backup and troubleshooting services during post commissioning period is provided from our EPC centre by the Process and Projects group.

News

9th Apr, 16

Awarded Composite works at M/s. BPCL, Mahul

Two projects awarded consisting of Civil, Structural, Mechanical, Piping, Insulation & Painting works for TGTU at M/s. BPCL, Mumbai Refinery.

24th Apr, 16

FFIL completes 38 No. Tankages for Godrej Industries Ltd.

Successful completion of Supply, Fabrication & Erection of 38 No. Tanks at Valia, Gujarat.

24th Jun, 16

FFIL bagged an award for EPC works Sulphuric Acid Storage Tanks for OCP, Morocco

A mammoth project has been awarded to FFIL by Groupe OCP, Morocco. It consists of complete Civil & Structural works, E&I, Mechanical & Piping Works including construction of storage tanks.

28th Oct, 16

Furnace Fabrica enters Soda Ash plant sector

Awarded Mechanical works for M/s. Rohit Surfactants Pvt. Ltd., Dwarka. This marks FFIL’s entry in another segment of chemical industry (Soda Ash plant).

30th Oct, 16

FFIL awarded first project to be executed for M/s. Ramagundam Fertilizers & Chemicals Ltd.

Awarded Building works worth for M/s. RFCL, Ramagundam. This is a critical politically driven project for the revival of Ramagundam Fertilizers Complex.

8th Dec, 2016

Two Contracts bagged for Infra works for M/s. Hooghly River Bridge Commissioners

Awarded two huge Infra works for M/s. Hooghly River Bridge Commissioners. It consists of Construction Of Two Nos. Of Right Turn Flyovers Across Kona Expressway & Renewal of Tram Track with concreted pavement along R.G. Kar Road.

Inquiry