Composite Works for Upgrading Pump Stations/Terminals of Naharkatiya- Barauni Crude Oil Pipeline (NBPS)

  • Scope Highlights :-Supply of Basket Filter, EOT Crane, Split Air Conditioning System & chain pulley blocks with geared trolley and replacement of scraper traps, unloading/storage at site, installation & commissioning of insulating joints, all valves, metering assemblies, mainline pumps, booster pumps & re-start pumps, basket filters, equipments, sump tank & pump, Corrosion Inhibitor Dosing System and all piping works/ facilities
  • Electrical Works related to HV/MV power and control cables, Neutral Grounding Resistor, electrical heat tracing equipment/materials, etc.
  • Complete instrumentation and control installation works, optical fiber cable installation
  • Supply of all materials, consumables, tools, tackles, machinery, equipments, manpower etc. required for construction, fabrication, erection, installation, painting, testing, commissioning & supervision of all General Civil works including design, supply, fabrication, testing, commissioning, guarantying of MV Spray system/foam system and rim seal fire protection system
    • Year of Execution: 2018

Project Gallery

News

21 Feb, 2018

FURNACE FABRICA AWARDED CONTRACT FOR PHOSPHORIC ACID PLANT IN TAMIL NADU (INDIA)

Details: Design, Manufacture, Supply, Erection, Commissioning and Demonstration of Performance Guarantee of 800 TPD Phosphoric Acid Plant

27 Oct, 2017

FURNACE FABRICA AWARDED CONTRACT FOR PHOSPHORIC ACID STORAGE TANK IN TAMIL NADU (INDIA)

Details: Design, Engineering, Procurement, Construction and Erection of Phosphoric Acid Storage Tank (India)

11 Aug, 2017

FURNACE FABRICA AWARDED CONTRACT FOR COMPOSITE WORKS OF UTILITY AND OFF-SITE

Details: Composite works of Utility and Off site for revival of Fertilizer Complex in Telengana (India).

18 July, 2017

FURNACE FABRICA AWARDED CONTRACT FOR CONCENTRATED ACID PLANT PROJECT IN MOROCCO

Details: Supply and Installation of metallic pipes and equipments for acid plant project

12 April, 2017

FURNACE FABRICA AWARDED CONTRACT FOR CCR PROJECT

Details: Civil and Structural Works for CCR Project and LNG Relocation Works

27 Feb, 2017

FURNACE FABRICA AWARDED CONTRACT FOR REFINERY IN KOCHI

Details: Site enabling works for BS-VI MS Block Project