RELOCATION / REVAMPING

Here in FFIL, a revamp of a plant demands changes like increase of plant capacity, reduction of gas consumption and emissions to the environment, product quality improvement and energy optimization.

FFIL specializes in assisting the client with Feasibility Analysis on the revamp / modernization project:

  • Feasibility study
  • Plant Health Study Services
  • Revamping
  • Relocation
  • Debottlenecking : a process that begins with the evaluation of the plant in its entirety and identifying the obstacles that come in the way of an increase in the capacity.

 

FFIL does the following to evaluate the health of the plant:

  • Study of Physical Health of the Plant – Integrity of Equipments and Structures.
  • Study of Heating Equipments – Preheaters, Heaters, Boilers etc.
  • Study of Rotating Equipments – Drives, pumps, blowers etc.
  • Study of Electrical and Instrumentation Systems.
  • Study of other parts of the Plant including filtration & evaporation systems, material handling systems etc.

 

Process plants are subject to permanent adjustment pressure for optimization in the areas of:

  • new or changing feed materials
  • products and product specifications
  • environmental regulations
  • demands on energy savings

 

Major optimization targets are, in addition to cost cutting, plant quality and capacity improvements. Through a revamp FFIL promises its customers:

  • Capacity and revenue increases
  • Improvement of product quality
  • Reduction of operating costs
  • Process optimization
  • Adaptation of plants to new products as demanded by the market

 

Some of the notifiable deliverables are as follows:

  • Transformational revamp of 2×3500 tpd SAP’s at IFFCO Paradeep
  • Debottlenecking and Revamp of Two Calciners for NALCO, Damanjodi, India
  • Revamp and Re-construction of floating roof tanks and fixed roof tanks for Galana Raffinerie Terminal, Madagascar
  • Relocation of POM plant, South Korea for Tasnee Petrochemical & Industrial Co, Qatar

News

9th Apr, 16

Awarded Composite works at M/s. BPCL, Mahul

Two projects of total USD 5.3m awarded in Civil, Structural, Mechanical, Piping, Insulation & Painting works for TGTU at M/s. BPCL, Mumbai Refinery.

24th Apr, 16

FFIL completes 38 No. Tankages for Godrej Industries Ltd.

Successful completion of Supply, Fabrication & Erection of 38 No. Tanks at Valia, Gujarat.

24th Jun, 16

FFIL bagged an award for EPC works Sulphuric Acid Storage Tanks for OCP, Morocco

A project value of USD 21.5m has been awarded to FFIL by Groupe OCP, Morocco. It consists of complete Civil & Structural works, E&I, Mechanical & Piping Works.

28th Oct, 16

Furnace Fabrica enters Soda Ash plant sector

Awarded Mechanical works worth USD 5.25m for M/s. Rohit Surfactants Pvt. Ltd., Dwarka. This marks FFIL’s entry in another segment of chemical industry (Soda Ash plant).

30th Oct, 16

FFIL awarded first project to be executed for M/s. Ramagundam Fertilizers & Chemicals Ltd.

Awarded Building works worth USD 12.17m for M/s. RFCL, Ramagundam. This is a critical politically driven project for the revival of Ramagundam Fertilizers Complex.

8th Dec, 2016

Two Contracts bagged for Infra works for M/s. Hooghly River Bridge Commissioners

Awarded two Infra works worth USD 6.5m for M/s. Hooghly River Bridge Commissioners. It consists of Construction Of Two Nos. Of Right Turn Flyovers Across Kona Expressway & Renewal of Tram Track with concreted pavement along R.G. Kar Road.

Inquiry